Official Gazette on self-consumption and net billing
The core PV and storage framework is in force.
Here you can see what is already official, what still needs confirmation, and what we review before a balcony installation moves ahead.
A concrete draft ministerial decision is now in public consultation until 20 July 2026. Before the order moves ahead, we confirm which process applies to your case.
The chronology keeps the official rule, landlord or building approval, and the still-open items separate.
The core PV and storage framework is in force.
The notification idea is public, but we do not treat it as final without the written text.
The ministry published a concrete text for systems up to 800 W and standalone batteries, with notification to HEDNO via a Digital Gateway. The consultation is open until 20 July 2026.
We wait for the Gazette publication and confirm the balcony, the owner, and the official procedure all line up before locking the package.
As of 14 July 2026, Greece has an official framework for self-consumption and net billing, and for plug-in systems up to 800 W the ministry has now published a concrete draft ministerial decision in public consultation (open until 20 July 2026). It is a real step forward, but until the final text is published in the Gazette we confirm the procedure before equipment is ordered.
| Status | What it means | Source |
|---|---|---|
| Confirmed | An official decision exists for self-consumption, synchronized offsetting, collective self-consumption, and storage. | Ministry Gazette B 5074/2024 |
| Confirmed | HEDNO/DEDDIE is the electronic-application and grid-connection body for PV systems on the distribution network. | HEDNO PV FAQ |
| In consultation | The ministry published a draft ministerial decision for systems up to 800 W (injection power) and total installed capacity up to 900 W, with pure self-consumption, notification to HEDNO via a Digital Gateway, no connection agreement and no connection fee. Consultation is open until 20 July 2026. | Ministry - draft decision / public consultation |
| Watch points in the draft | The text requires an installer's Declaration of Responsibility renewed every two years (a licensed electrician), a directional sensor to block reverse flow, and telemetry / a smart meter. We track whether these change in the final version. | Plug-in systems up to 800 W |
| What we review in practice | We check the railing, shade, wiring, building rules, and any local restrictions before recommending a final setup. | Practical check |
Balcony photo, orientation, shade, mounting points, and cable route.
We confirm HEDNO requirements, the current legal framework, and any building-level approvals if they apply.
We send the final setup once the review is complete and the next steps are clear.
We review the balcony, any owner or building requirements, and the right process so the proposed setup is workable from the start.
Below are the main official sources and public references we monitor for these installations.